SERVICES

Testing and commissioning

A close up of a piece of orange paper on a white background.

Instalec Group has the expertise and equipment to diagnose technical faults and ensure solutions are sustainable, through:
  • High Voltage Testing Equipment for diagnostics, testing and commissioning. 
  • Instalec Group provides this service with owned equipment ready for use in the Northern Territory.
  • Preferred supplier arrangements for switchboard testing and commissioning.

Recent project examples that we have been involved in include:


  • Testing, handover documentation and commissioning of Electrical Instrument and Control of the Osmoflo Water Treatment Plant - Brine Squeezer technology to treat water for environmental discharge at Ranger Mine for Energy Resources of Australia.
  • Installation and commissioning of surge pumping system for wet season non treated overflow prevention at Ranger Mine for Energy Resources of Australia.
  • RCD Testing, Earthing and Smoke Alarms at South32 for Groote Eylandt Mining Company.
  • High Density Sludge Disposal - Flamingo Flow Meter testing and commissioning at Ranger Mine for Energy Resources of Australia.
  • Brine Concentrator DA7 Fault Finding for Veolia Australia at ERA Ranger Mine.
  • High Voltage relay testing to meet statutory inspection and testing cycles at Ranger Mine for Energy Resources of Australia.
  • Commissioning of the Brine Concentrator (BC3) fan upgrade at Ranger Mine for Energy Resources of Australia.